Wire and Cable Manufacturing Plant Project

Publish Time: 2020-12-29     Origin: Site

The wire and cable manufacturing plant project covers an area of 87000 sqm, is located in Qingdao, with a planned construction area of 48000 sqm. The asphalt station is the highest portal steel frame project undertaken by Reger, with a height of 42.7m. The project installation work was finished within 90 days, which is 10 days ahead of schedule.