Steel Structure Chemical Plant Project

Publish Time: 2021-05-12     Origin: Site

Steel structure chemical plant located in Chengyang District, Qingdao City, construction area 16174sqm, Reger undertake the construction of light alloy incubation workshop No. 2 workshop. 

Steel structure chemical plant adopts strict construction requirements: Level 1 fire resistance, explosion-proof measures are taken for walls, doors and windows, and roofs. The wall outer panel adopts the construction method of the new material of the strong board, and the roof outer panel adopts explosion-proof installation.

Reger Steel Structure will Attend IndoBuildTech 2024 from 7-11 August

What Is Steel Structure Fabrication Process of Steel Structure Warehouse?

Maldives Multi-Floor Steel Frame Structure Building for Seafood Processing Factory

Modern Steel Warehouse and Office in Algeria

Reger Industrial Park Project Case